|
Post by leokeeler on Nov 29, 2015 19:51:13 GMT
NOTE: Changes in the Declaration language are denoted with BOLD italics (new language) and strikethrough (removed language.)
6.03. Utilities. All electrical and telephone lines, water and sewer pipelines, septic tanks, cisterns, drainfields, gas lines and other utilities installed after the effective date of these covenants shall be placed underground. Pipelines and gas lines shall be placed least 36” beneath the surface. Electric and telephone lines shall be placed at least 12” - 18” beneath the surface, unless adverse geologic conditions require otherwise. Propane or other fuel tanks, windmills, tanks, pumps and the like may be placed above ground. In any event, the installation of all utilities and lines shall be in accordance with the Master Plan and all applicable statutes, regulations, ordinances, rulings and other code requirements in effect at the time of the installation.
|
|